Launch day is when small oversights become public: a contact form that sends to an old email address, a page still showing placeholder text, or a setting that hides the whole site from Google. Most of these take minutes to fix before launch and much longer to undo after. Work through this checklist with your team a few days before going live.

Content

  • Every page has been proofread, including headings, buttons and form labels.
  • All placeholder text and sample images are gone.
  • Phone numbers, email addresses, addresses and opening hours are correct everywhere they appear.
  • Prices and offers match what you actually charge.
  • Legal pages are in place: privacy policy, terms, and refund or return policy if you sell online.
  • Images are your own, licensed or free to use.
  • The favicon (the small browser tab icon) is set.
  • There is a helpful 404 page that links back to the main sections.

Forms and functionality

  • Every form submits successfully and the message arrives at the right inbox.
  • Visitors see a clear confirmation after submitting, and any auto-reply email reads well.
  • Every link works; nothing points to a staging address.
  • Phone links open the dialler and WhatsApp links open the right chat on a phone.
  • Sign-up, login and password reset work, if your site has accounts.
  • Search and filters return sensible results.
  • A real payment has been tested end to end, then refunded, if you take payments.
  • Order confirmation emails and receipts are correct.

Mobile and browsers

  • Every page has been checked on at least one Android phone and one iPhone.
  • Menus open and close properly on small screens.
  • Text is readable without zooming, and buttons are easy to tap.
  • Nothing scrolls sideways on a phone.
  • The site works in Chrome, Safari, Edge and Firefox.

SEO

  • Every page has a unique title and meta description.
  • Each page has one main heading (H1).
  • Images have descriptive alt text.
  • The site is not blocked from search engines. Check that robots.txt does not disallow everything and that pages have no "noindex" tag left over from staging.
  • A sitemap.xml exists and lists your important pages.
  • If you are replacing an old site, every old URL redirects (301) to its new equivalent.
  • Social sharing previews (Open Graph title, description and image) look right.

Speed

  • Images are compressed and sized for the screen they appear on.
  • Images below the first screen load lazily; the main hero image does not.
  • Third-party scripts such as chat widgets and trackers are limited to what you need.
  • PageSpeed Insights has been run on the home page and a key inner page on mobile, and major issues are fixed.

Security

  • The whole site loads over HTTPS, and http:// addresses redirect to https://.
  • Admin accounts use strong, unique passwords, with two-factor sign-in where available.
  • Test accounts and sample data have been removed.
  • Forms have spam protection.
  • Backups are scheduled, and someone knows how to restore one.
  • Software, plugins and dependencies are up to date.

Analytics and tracking

  • Google Analytics is installed and recording visits.
  • Google Search Console is verified and the sitemap has been submitted.
  • Key actions such as form submissions, calls, WhatsApp clicks and purchases are tracked as events or conversions.
  • Advertising pixels are installed if you plan to run ads, with consent handled where needed.

Launch day

  • Domain and DNS changes have been planned, ideally with a short DNS time-to-live set a day before so changes spread quickly.
  • Launch at a quiet time for your business, not just before a weekend or holiday.
  • Someone checks the live site immediately after the switch: home page, forms, payments and mobile.
  • Uptime and error monitoring are switched on.

The week after launch

  • Check analytics daily for unusual drops, errors or pages with no visits.
  • Check Search Console for crawl errors and indexing issues.
  • Ask a few customers to use the site and tell you what confused them.
  • Keep a list of small fixes and improvements, and schedule them.
  • Announce the new site to your customers by email, WhatsApp and social media.

Who does what

On a DIGITECHIE project, testing and deployment are steps in our process: we check forms, devices, speed and security basics, then handle hosting, SSL, analytics and Search Console at launch. Your part is the content, an acceptance check of the staging site and access to your domain. After launch, every website plan includes free support for one to three months, depending on the plan.

If you are still planning, start with how much a website costs, or book a discovery call to talk through your launch date.